Client | Year | Project | Scope Details |
---|---|---|---|
Thomassen Energy | 2024 | GE Turbine Overhaul | Outsourcing Technical Advisors to supervise the overhauling activities scheduled for General Electric 9E Turbine at Arish power plant. |
Heidelberg Materials – Helwan Cement | 2024 | Helwan Cement WHR – O&M | Outsourcing Operation & Maintenance staff to waste heat recovery power plant at Helwan cement plant. |
Siemens | 2020 | Assiut 1x650 Supercritical PP, Cairo West Supercritical PP | DCS Commissioning Engineer T3000 |
Pioneers Technical | 2024 | Diesel Generators Maintenance Plan | Staffing of technical team to perform planned Diesel Generator maintenance. |
Siemens Energy | 2024 | Khormala | Provision of mechanical lead commissioning engineer Khormala power plant |
JOULES ENERGY LIMITED | 2023 | Nigeria LNG Limited Plant Complex Finima Bonny Island 503010 | Staffing for Electrical Testing and Transformer Maintenance |
NRG Global Power | 2024 | Sirte Steam Power Plant Commissioning | Seconding manpower, provision of personnel and commissioning equipment for testing and startup of 350mw Sirte steam power plant project |
General Electric | 2019 | Waad Elshamal 1300MW CCPP | Manpower Sourcing for commissioning and operation |
SHANDONG ELECTRIC POWER CONSTRUCTION GROUP Saudi Arabia | 2018-2019 | Shaybah Combined Cycle Power Plant | Providing Commissioning Manager |
Siemens | 2017-2018 | Azura Edo Power Plant Nigeria | Manpower Sourcing for commissioning and operation team |
AC Boilers | 2017-2018 | Al-Shabab Power Plant conversion to combined cycle 2x250MW | Manpower Sourcing for HRSG commissioning and operation |
AC Boilers | 2017-2018 | West Damietta II Power Plant 1x250MW | Manpower Sourcing for HRSG commissioning and operation |
General Electric | 2017-2018 | Assiut PP conversion to combined cycle 2x250MW | Manpower Sourcing for commissioning and operation team |
General Electric | 2017-2018 | West Damietta I PP conversion to combined cycle 1x250MW | Manpower Sourcing for commissioning and operation team |
Siemens | 2016-2017 | New Capital - Burrulus - Beni Suif (3x4800MW CCPP) | Manpower Sourcing for commissioning and operation team |
General Electric | 2016 | W. Damietta 4X125MW | Manpower Sourcing for Plant QC Services |
Hyundai Heavy Industries | 2016 | South Jeddah 4X660MW Supercritical Power Plant | Manpower Sourcing for Plant Operation |
General Electric | 2015 | TM2500+TM Mobile Gas Turbine Generators at 10 sites each with 2 units | Manpower Sourcing sourcing for plants operation |
General Electric | 2015 | Assiut 8X125MW W.Damietta 4X125MW | Manpower Sourcing sourcing for plant commissioningand operation |
General Electric | 2015 | Kuraimat Solar 150MW ISCC | Manpower Sourcing for outage for turbine shaft maintenance |
ABB Mannheim | 2011 | IRAQ - Erbil Gas Turbine power plant 2x125MW | Construction Supervision Commissioning and Start-up of GT & auxiliaries through a seconded commissioning manager GE Gas Turbine |
ABB Mannheim | 2010-2011 | IRAQ - Al-Solaimanyah Gas Turbine power plant 2x125MW | Construction Supervision Commissioning and Start-up of GT & auxiliaries through a seconded commissioning managerGE Gas Turbine |
ABB Mannheim | 2010-2011 | IRAQ - Dohuk 4x125MW GE Gas T. | Construction Supervision Commissioning and Start-up of GT & auxiliaries through a seconded commissioning managerGE Gas Turbine |
Mitsubishi Electric Co. (MELCO) | 2009 | Sidi Krir and El-Atf Combined Cycle Power Plant - 750MW each. | Long Term Service Agreement for Commissioning Support and start up activity. |
ABB Mannheim | 2009 | QATAR - QATALUM Combined Cycle Power Plant | Electrical (LV & MV SWGR, Power Transformers, HV cables, Generator Circuit Breaker, and DC systems), Commissioning and Project Controls Support. |
ABB Manheim | 2007 2008 | QATAR - Abu Fontas Power Plant Project (QEWC) - Qatar | Electrical (LV & MV SWGR, Power Transformers, HV cables, Generator Circuit Breaker, and DC systems), Protection and Control Systems Installations, commissioning and startup services. |
ABB Manheim | 2007-2008 | LIBYA - Benghazi 319 pumping station | Electrical (LV & MV SWGR, Power Transformers, HV cables, Generator Circuit Breaker, and DC systems), Protection and Control Systems installations, commissioning and startup services. |
Global Partners / Cegelec France | 2004 | El-Gabal El-Asfar Waste Water Treatment Project Cegelec scope of work through "Global Partners" | Electrical Start-up and Commissioning. |
ALSTOM Power Inc. | 2001-2003 | Aswan High Dam Control System Upgrade 12x175MW | Commissioning and start- up of Aswan High dam new DCS system. |
Copyright © 2024 EGYPTROL , All Right Reserved.