Shubra Elkheima Thermal Power plant 4 x 330 MW Replacement & Rehabilitation of the Fire Fighting Network


  • Site Surveying & inspection as well as studying different options for pipe routing.
  • Preparation of 3D Model "Using Intelligent Plant 3D software" encompassing old network and new network showing the overlaps.
  • Issuing Bill of Quantities "BOQ's", Technical Specifications & Tender Package.
  • Issuing Isometrics & Fabrication Drawings.
  • Issuing Steel Supports and Trenches Design Drawing.
  • Issuing Structure Analysis Calculation Reports for Steel Supports.



Bird eye plant view on Plant 3D


Pipes and buildings on Plant3D model


AutoDesk Plant3D Modeling in Egypt


Plant3D piping model