We Serve Professionally


Home / Projects / Engineering Scope Projects

Engineering Scope Projects

Client Year Project Scope Details Show Case
SDX Energy / Upstream Advisors 2017 Meseda Field Expansion Project “10,000 bpd to 20,000 bpd” – Work Order 1 “WO3” – Lines, Tanks & Water Injection Complete Civil, Piping (3DModel & Isometric Using Plant3D Software), Mechanical, Electrical and Instrumentation Detail Engineering (Full Detail Design) for WO3

SDX Energy / Upstream Advisors 2017 Meseda Field Expansion Project “10,000 bpd to 20,000 bpd” – Work Order 1 “WO2” – Tie Ins Complete Civil, Piping (3DModel & Isometric Using Plant3D Software), Mechanical, Electrical and Instrumentation Detail Engineering (Full Detail Design) for WO2

SDX Energy / Upstream Advisors 2017 Meseda Field Expansion Project “10,000 bpd to 20,000 bpd” – Work Order 1 “WO1” – General Engineering Complete Civil, Piping (3DModel & Isometric Using Plant3D Software), Mechanical, Electrical and Instrumentation Detail Engineering (Full Detail Design) for WO1

SDX Energy / Upstream Advisors 2017 Meseda Field Expansion Project “10,000 bpd to 20,000 bpd” – 1 Year Engineering Services Agreement Complete Civil, Piping, Mechanical, Electrical and Instrumentation Detail Engineering (Full Detail Design) for Meseda Field Expansion Project based on agreed engineering work orders

Airliquide EGYPT 2017 JUSHI Sokhna SIGMA Project Electrical Construction Supervision Scope

GE Grid 2017 Cairo West Substation-Temporary Extension 500 KV – Primary and Secondary Electrical Engineering Scope Complete electrical engineering detail design – Primary and Secondary detail engineering scope

WEPCO “Badr Eldin” / “EMC- صان مصر ” 2017 New Skid Mounted Generators “Gas Engines’ at BED-1 Site – approx. 2.5 MW + synchronization with existing gas engines Complete Civil, Piping (3DModel & Isometric Using Plant3D Software), Mechanical, Electrical and Instrumentation Detail Engineering (Full Detail Design) for the skid mounted gas engine generators, BOP systems & outdoor shelters

Mantrac / Caterpillar 2017 American Embassy in IRAQ - 20MW Diesel Power Plant Detailed short Circuit Calculation Using Etap

KSB Pumps / EMC (Egyptian Marketing Consultants) / PowerServ 2017 New Abu Qir Power Pant 2X650 MW - Replacement of feed water pumps of Unit 7 1- Site Surveying & inspection as well as studying different options for pipe routing.
2- Preparation of 3D Model "Using Intelligent Plant 3D software" encompassing old pumps and new pumps showing the overlaps.
3- Stress Analysis Using Caesar intelligent Software.
4- Issuing Bill of Quantities "BOQ's".
5- Issuing Isometrics Drawings.

KSB Pumps / EMC (Egyptian Marketing Consultants) / PowerServ 2016-2017 Abu Qir Power Pant 4X150 MW - Replacement of feed water pumps of Unit 2 1- Site Surveying & inspection as well as studying different options for pipe routing.
2- Preparation of 3D Model "Using Intelligent Plant 3D software" encompassing old pumps and new pumps showing the overlaps.
3- Stress Analysis Using Caesar intelligent Software.
4- Issuing Bill of Quantities "BOQ's".
5- Issuing Isometrics Drawings.

ZEITCO / “EMC-صان مصر ” 2016-2017 PETRONEFERTITI Site – FF network study for new Oil Separator 1- Preparation of P&ID's "Using Intelligent Plant 3D software" for the FF system.
2- Prepare Hydraulic Calculation Report for 3 scenarios using Elite Software.
2- Preparation of 3D Model "Using Intelligent Plant 3D software.
3- Issuing Bill of Quantities "BOQ's" & Technical Specifications.
4- Issuing Isometrics & Fabrication Drawings.
5- Complete design for Fire Detection and Alarm systems.

Egyptian Maintenance Company “EMC-صان مصر" 2016-2017 2 Years Engineering Services Agreement Provide Full Detail Engineering to Support EMC in Pre-Tender, Tender and Post Tender “In Case EMC is the successful Bidder” stages for all Oil & Gas Projects/Tenders.

Cairo Electricity Production Company 2016-2017 Shubra Elkheima Thermal Power plant 4 x 330 MW - Replacement & Rehabilitation of the Fire Fighting Network Mechanical, Piping & Civil Construction Supervision Scope

Arab Contractors 2016-2017 Cairo West 650 MW Supercritical Power Plant Support Arab Contractor during tender stage by preparing BOQ's, calculation reports, design drawings and execution procedures for the civil & electromechanical scope of CP-102 Civil package.

Arab Contractors 2016-2017 Assuit 650 MW Supercritical Power Plant Support Arab Contractor during tender stage by preparing BOQ's, calculation reports, design drawings and execution procedures for the civil & electromechanical scope of CP-102 Civil package.

Airliquide EGYPT 2016-2017 SIDPEC CO2 Industrial Plant Mechanical, Piping, Electrical & Civil Construction Supervision Scope

Hyundai Engineering & Construction “HDEC” 2016-2017 Ayoun Mousa IPP Coal Fire Power Plant Consultancy Services

Airliquide EGYPT 2016 SIDPEC CO2 Industrial Plant Complete Civil, Piping (3DModel & Isometric Using Plant3D Software), Mechanical, Electrical and Instrumentation Detail Engineering (Full Detail Design) for the Co2 Plant, BOP and Main/Ancillary Buildings.

Airliquide EGYPT 2016 JUSHI Sokhna VSA Project Mechanical, Piping and Electrical Construction Supervision Scope

Airliquide EGYPT 2016 JUSHI Sokhna VSA Project Complete Piping (3DModel & Isometric Using Plant3D Software), Mechanical and Electrical Engineering services (Full Detail Design) for VSA GOX, LOX & GOX Backup, cooling water, seal water and FF systems

SIEMENS / BUREAU VERITAS 2015-2016-2017 4x4800MW CCPP for New Capital (Cairo), Burullus and Beni Suef Consultancy Services

EMC (Egyptian Marketing Consultants) 2015-2016 EGYPT - Farafra Diesel Power Station 4 X 4 MW - MAN Gensets
  1. Preparation of P&ID's "Using Intelligent Plant 3D software" for 6 systems (Fuel Oil, Lube Oil, Compressed Air, Sludge, Exhaust & Cooling Water).
  2. Preparation of 3D Model "Using Intelligent Plant 3D software" for 6 systems (Fuel Oil, Lube Oil, Compressed Air, Sludge, Exhaust & Cooling Water).
  3. Issuing Bill of Quantities "BOQ's" & Technical Specifications.
  4. Issuing Isometrics & Fabrication Drawings.
  5. Issuing Steel Supports and Trenches Design Drawing.
  6. Issuing Structure Analysis Calculation Reports for Steel Supports.

EMC (Egyptian Marketing Consultants) / PowerServ 2015 Assuit Elwalidia Thermal Power Plant 2 X 300 MW - H2 Plant Replacement Project
  1. Preparation of 3D Model "Using Intelligent Plant 3D software" encompassing old network and new network showing the overlaps.
  2. Issuing Bill of Quantities "BOQ's" for piping, fittings & valves.

KSB Pumps / EMC (Egyptian Marketing Consultants) 2015 Abu Sultan Power Pant 4X150 MW - Replacement of feed water pumps of Unit 1
  1. Site Surveying & inspection as well as studying different options for pipe routing.
  2. Stress Analysis Using Caesar intelligent Software for the Suction Lines.
  3. Issuing Steel Supports Bill of Quantities "BOQ's".
Details

Cairo Electricity Production Company 2015 Shubra Elkheima Thermal Power plant 4 x 330 MW - Replacement & Rehabilitation of the Fire Fighting Network
  1. Site Surveying & inspection as well as studying different options for pipe routing.
  2. preparation of 3D Model "Using Intelligent Plant 3D software" encompassing old network and new network showing the overlaps.
  3. Issuing Bill of Quantities "BOQ's", Technical Specifications & Tender Package.
  4. Issuing Isometrics & Fabrication Drawings.
  5. Issuing Steel Supports and Trenches Design Drawing.
    6- Issuing Structure Analysis Calculation Reports for Steel Supports.
Details

KSB Pumps / EMC (Egyptian Marketing Consultants) 2015 South Helwan 3 X 650 MW Supercritical Thermal Power Plant - PO109A Circulating Pumps Package
  1. Design Review.
  2. Local Technical Coordination & Support.

Benchmark Power International "BPI" 2014-2015 BPI1 IPP 1150 MW CCPP - Motobus - KafrElsheikh Developer Engineer

Arab Contractors 2014-2015 750MW Alshabab and West Damietta Conversion Power Project Support Arab Contractor during tender stage by preparing BOQ's, calculation reports, design drawings and execution procedures for the civil & electromechanical scope of CP-102 Civil package.

Hang Zhou Boilers 2014-2015 750MW Alshabab and West Damietta Conversion Power Project Support Hang Zhou OEM during tender stage by reviewing proposal technical documents, drawings and execution procedures for CP-105 HRSG package.

Aquatech / EMC 2014-2015 3x650MW South Helwan Supercritical Thermal Power Plant Support Aquatech during tender stage by preparing civil conceptual and Detail design, BOQ's , Procurement Management for CP-111 Water Treatment package

KSB Pumps / EMC 2014-2015 Abu Sultan Power Pant 4 X 150 MW - Replacement of feed water pumps of Unit 1
  1. Site Surveying & inspection as well as studying different options for pipe routing
  2. Preparation of 3D Model "Using Intelligent PDMS software" encompassing old pumps and new pumps showing the overlaps.
  3. Stress Analysis Using Caesar intelligent Software.
  4. Issuing Bill of Quantities "BOQ's".
  5. Issuing Isometrics & Fabrication Drawings.
  6. Issuing As Built Drawings.
Details

Mantrac / Caterpillar 2014-2015 American Embassy in IRAQ - 20 MW Diesel Power Plant
  1. Preparation of 3D Model "Using Intelligent PLANT 3D software" for the Mechanical Systems.
  2. Issuing Plan, elevation and sectional views drawings.
  3. Issuing Bill of Quantities "BOQ's".
  4. Issuing Isometrics & Fabrication Drawings.
  5. Issuing As Built Drawings.

Arab Contractor 2013 3x650MW South Helwan Supercritical Thermal Power Plant. Support Arab Contractor in tender stage by preparing BOQ and execution procedures for CP-102 package.

Hassan Allam Sons 2013 3x650MW South Helwan Supercritical Thermal Power Plant. Providing technical support in the preparation of bid documents to HAC for CP-105 package.

TAQA 2013 7x1MVA+1x.5MVA DG power plant, Marsa Alam. Study for efficiency improvement.

EMC 2012 Abu Sultan Power Plant Unit 3, replacement of 3 Feed Water Pumps. Full piping stress analysis and 3D Modeling for feed water system piping. Details

Orascom Construction 2012 4x125MW Simple Cycle Power Plant Azura, Nigeria. Prepare the Technical Proposal for EPC Contract in association with PESCO.

Arab Contractors 2012 4x125MW Simple Cycle Diwaniya Power Plant. Prepare the Technical Proposal for EPC Contract in association with PESCO.

Orascom Construction 2012 8X15 MW Diesel Engine Power Plant, Mauritania. Prepare the Technical Proposal for EPC Contract in association with PESCO.

Roots Steel Systems 2012 Pre-Engineered Steel Factory. Full electromechanical system detailed design and integration with civil and architecture design and construction supervision.

Multipharma for pharmaceutical and chemicals company 2012 Multipharma warehouse-New Cairo. Full electromechanical system detailed design and integration with civil and architecture design.

Tam Environmental Services 2011-2012 Matrouh Water RO Desalination plan 24,000 m3/day. Full electromechanical system detailed design and integration with civil and architecture design and construction supervision.

Engineering Solutions ES 2011 El-Nafl Residential Complex-KSA. Electromechanical Systems Design.

Kharafi National 2011 5X8 MW Diesel Generators Power Plant, Juba. Preliminary Design for civil, mechanical, electrical and control systems.

Kharafi National 2011 W. Damietta –4X125MW SCPP. Pipe lines hydraulic calculations, for all auxiliary systems (water and fuel).

VECG 2011 El-Haram Power Generation Plant El-Madeinah El-Monawara. Mechanical systems shop drawings.

Kharafi National 2011 Damietta - 4x125MW SCPP Elshabab - 8x125MW SCPP . For Firefighting, water systems and fuel oil system
- Pipe lines hydraulic calculations
- P&ID review

Egyptian Canadian Pharmaceuticals ECAN Pharmaceuticals 2009-2010 With: Egypt. Comp. for Complementary Works ECC Facility – El Obour City, Cairo, Egypt. Preparation of Electrical, Fire Fighting and plumbing systems Contractor Package.

Electro Tharwat 2010 Al-Gabal Al-Asfar, Cairo - Alex & EL-Haramain railways projects. Tender document study and determination of BOQ.

AIR LIQUIDE 2009 Gases Production Plant at the 6th of October City. Design Cooling System Logic Diagrams.

PGESCo 2009 Design for New Transformer Factory – Badr City for ELMACO. Steel Structure Design as a sub-consultant to PGESCo.

AUG Pharmaceuticals 2008 AUG Pharmaceuticals Facility – 6th of October City, Cairo, Egypt. Full electromechanical system detailed design and integration with civil and architecture design and construction supervision.

Power Generation Engineering and Services Company (PGESCo) 2008 PGESCo building at New Cairo - 3 floors extension. Consultation Services - Electromechanical Contractor Package preparation.

Global Partners – INITEC. 2008 El-Kuraimat (III) Power Plant Project CP-105 & CP-106 Scope. Grounding System Design and BOQ within INITEC scope of supply.

Global Partners – INITEC. 2008 El-Tebbin Power Plant Project CP-106 & CP-118 Scope. Grounding System Design and BOQ within INITEC scope of supply.

Global Partners – INITEC. 2008 Nubaria (III) Power Plant Project CP-106, CP-117 & CP-118 Scope. Grounding System Design and BOQ within INITEC scope of supply.

GlaxoSmithKline 2007 Compressors station upgrade Egypt – Madinet El Salam Manufacturing Facility. Supply, Installations and commissioning for Upgraded Station Electrical and Control System.

Shell Oil – through United Engineering Co. 2007 Rehabilitation of Light Fuel oil Pumping station. Mostorod facility – Cairo. Mechanical, Electrical, Protection and Control Systems Installations, commissioning and startup services.

GlaxoSmithKline 2005-2006 Egypt – Madinet El Salam Manufacturing Facility Consultation Services for Survey for Factory Electrical System as built drawings preparation.

Egypt Ministry of Irrigation and Water Resources 2005 El Farma water pumping station Control System analysis and troubleshooting. Resolution system problems.

CONTRACK International Inc. 2004 U.S. Brigade Compound Kabul Military Training Facilities, Kabul, Afghanistan. Full Engineering and Coordination with CONTRACK engineering and its system sub-suppliers for the Power Plant Fuel Oil System control system and piping.

GlaxoSmithKline 2004 Survey of internal control panel wiring Old Low Voltage Substation Survey of internal control wiring and issue wiring AS BUILT.

Oman Water Authority 2004 FAHOUD RO water Treatment. Preparation of PLC specification, logic diagrams and plant operation description.

ALSTOM Power Inc. 2001-2003 Aswan High Dam Control System Upgrade – 12x175MW Quality Assurance / Quality Control For project

Hi-Tec Pioneers “Egyptian Ministry Of Irrigation and Water Resources” 2000-2002 Bahr Tanah (Mansoura) Irrigation System levels control. Control system design.

US Filters “Egyptian European Pharmaceutical Co.” 2001 Water Treatment Plant Piping And Isometric Design.

US Filters 1998-2001 Water and Waste Water Treatments for many Projects in EGYPT Piping and Isometric Design. Mechanical and Piping Isometric Design. Main Electrical and Control Panel Design.

Ministry of Electricity –New & Renewable Energy Authority 2000 Experimental 15kW Wind Turbine Generation Unit Control system design.

US Filters “Ghazala Village” 1999 Water treatment plant Shop drawings of electrical & instruments installations. Electrical & instruments installations.

US Filters “Dream Land Project” 1998 Sewage Treatment Plant Complete electrical design and system integration. Grounding system installation and testing.